Published case studyBrasil Mineral · #441 · Jul 2024

Grinding throughput on a gold mill

Industrial engagement · published in a trade magazine

+6%throughput vs manual
US$781Kannual margin, extrapolated
25controlled pilot (days)

Problem

Grinding is the largest energy consumer on a mill. Setpoint drift and harder, lower-grade ore make it difficult to hold throughput and particle size at the same time.

Method

Two-year collaboration with the plant process-engineering team. Controlled 25-day trial from 10 January 2024 to 5 February 2024. Modes alternated every 48 hours. Only periods with at least 85% active hours were compared — 265 hours in each mode.

Measured result

+6% throughput (435 t/h vs 412 t/h). 115,347 tonnes processed vs 109,079 tonnes. Particle size (p80) held. Energy intensity (kWh/t) stayed essentially unchanged. Extrapolated full-year effect at this plant: about 2,694 additional ounces of gold, about US$781,000 incremental annual profit net of all-in sustaining cost.

Source

Brasil Mineral magazine, issue 441, July 2024.

Fabio Suizu, FounderIdentified practitioner. The mill is a Canadian mid-tier gold producer. The operator is not named here because we do not have authorization to publish the company name or logo.

This is a published industrial engagement. It is not an API-platform customer logo.